Invitation to presentation of Scatec Solar ASA's second quarter results 2018


Oslo, July 6, 2018: Scatec Solar ASA will release its second quarter results on Friday, July 20, 2018 at 07:00 (CET).

A presentation of the results will be held on the same day at 08:00. The location of the presentation is Høyres Hus (6th floor), Stortingsgata 20, 0161 Oslo. The presentation and Q&A session can be followed through a live webcast from our website on: http://webtv.hegnar.no/presentation.php?webcastId=92016596

For more information, please contact:

Mikkel Tørud, CFO,           tel: +47 976 99 144       mikkel.torud@scatecsolar.com  


About Scatec Solar
Scatec Solar is an integrated independent solar power producer, delivering affordable, rapidly deployable and sustainable clean energy worldwide. A long- term player, Scatec Solar develops, builds, owns, operates and maintains solar power plants and has an installation track record of 1,000 MW. The company is producing electricity from 322 MW of solar power plants in the Czech Republic, South Africa, Rwanda, Honduras and Jordan and has 1,092 MW under construction.

With an established global presence and a significant project pipeline, the company is targeting a capacity of 3.5 GW in operation and under construction by end of 2021. Scatec Solar is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol 'SSO'. To learn more, visit www.scatecsolar.com